The Production of Laminate

The Production of Laminate 2018-04-11T06:23:59+00:00

1st Step: Press balance paper and base material, decorative layer and wear resistant layer together with the multi-layer press machine.

2nd Step: Place the flooring for 24 hours.

3rd Step: Cutting the flooring to a certain size.

4th Step: Place the flooring for a period of time to keep its stablity.(3-5 days in winter, 7 days in summer).

5th Step: Grooving (Double end milling longitudinal grooving, Double end milling lateral grooving).

6th Step: Checking the upper and lower surfaces and the lock.

7th Step: Sealing wax (as required).

8th Step: Packaging.